REGINA · HOME RENOVATION CASE STUDY

Rebuilding an addition after a roof leak and an unfinished renovation.

A leaking roof had left this Regina addition damaged. After a previous contractor took on the project but did not complete it successfully, Oakridge stepped in to repair the underlying damage and rebuild the space using a mix of new and repurposed materials.
Finished addition interior with wood cabinetry, new flooring and painted walls.
Completed · The rebuilt addition interior

PROJECT AT A GLANCE

Regina, Saskatchewan

Residential addition

Repair and rebuild

Framing, floors, kitchen and bathroom
Exposed ceiling framing and insulation above the bathroom during the addition repair.
Opened up · Ceiling and framing exposed during repairs

THE STARTING POINT

A damaged addition and a project left unfinished.

The homeowners were dealing with a leaking roof and a renovation that had not been successfully completed by the previous contractor. The addition needed more than fresh finishes: damaged exterior-wall framing and areas of the floor had to be addressed before the rooms could be put back together.

THE TRANSFORMATION

From an opened-up addition to a finished space.

Kitchen with the ceiling opened and roof framing visible during the addition rebuild.
During repairs · The kitchen and exposed ceiling
Finished addition interior with wood cabinetry, new flooring and painted walls.
After · The completed addition, viewed from another angle
The photos show different stages and angles of the same project. Oakridge repaired and rebuilt the structure, then brought the kitchen, bathroom and adjoining interior back together as a finished living space.

How Oakridge brought the project back together.

Remove damage and rebuild the structure

Work included removing deteriorated framing in the exterior walls, reframing a damaged bathroom corner, patching the subfloor and levelling the floor. Roof-support posts, sheathing and replacement windows were also part of the documented work.

Use what could be kept

The rebuild combined new work with existing materials. The original storm door was reinstalled, and the homeowners supplied a kitchen sink and faucet. Where a base cabinet had deteriorated, a replacement cabinet and toe-kick were built.

Finish the rooms as one project

After the structural and floor work, insulation, drywall, lighting, flooring, cabinetry, plumbing connections and finish carpentry brought the addition together. The bathroom and kitchen were completed as part of the same renovation.

THE PROJECT IN PHOTOS

The rebuild and the finished bathroom.

Exposed wall and ceiling framing with new floor framing during an addition rebuild.
During construction · Rebuilding the floor and wall framing
Finished bathroom with white vanity and toilet, wood cabinet and patterned floor.
After · The finished bathroom and flooring

THE RESULT

A damaged, unfinished addition became a finished part of the home.

This project required Oakridge to pick up an incomplete renovation, deal with damaged framing and coordinate the work needed to finish the rooms. The result brings together the rebuilt structure, kitchen and bathroom finishes, and existing items the homeowners wanted to keep.

Project scope: selective removal and framing repairs, floor and subfloor work, roof-support posts, replacement windows, insulation, drywall, electrical, plumbing, cabinetry, bathroom fixtures and interior finishes.

Planning a larger project or dealing with an unfinished renovation? Explore our Regina home renovation services or see how we plan renovation projects.

Historical project range: Oakridge’s invoiced work fell in the $45,000–$65,000 range, including tax. The homeowners supplied some items, and work paid to others is not included, so this is not necessarily the total project cost. It is historical context, not a quote.

LET’S PLAN YOUR RENOVATION

Need help moving a renovation forward?

Tell us what has happened, what remains unfinished and what you want from the space. We’ll discuss a practical next step.
Scroll to Top