REGINA · ENSUITE RENOVATION CASE STUDY

A new shower and a smoother ceiling for a Regina ensuite.

Oakridge rebuilt this ensuite around a new shower, vanity and flooring. The renovation also included work on the ceiling, ventilation and the walls behind the finishes.
Finished ensuite shower with a light-coloured surround, black fixtures and glass doors.
After · The new shower and glass enclosure

PROJECT AT A GLANCE

Regina, Saskatchewan

Residential ensuite

Ensuite bathroom renovation

Shower, ceiling, ventilation and updated finishes
Original ensuite shower enclosure, toilet and tiled floor before renovation.
Before · The original shower and tiled floor

THE STARTING POINT

An older enclosure and a textured ceiling.

The original ensuite had an enclosed shower, a wood vanity, a tiled floor and a textured ceiling. The renovation included removing the existing bathroom components and rebuilding the shower area before the new finishes were installed.

BEFORE & AFTER

The shower area, before and after.

Original ensuite shower enclosure, toilet and tiled floor before renovation.
Before · The original shower enclosure
Finished ensuite shower with a light-coloured surround, black fixtures and glass doors.
After · The new shower, surround and glass doors
The enclosed shower was replaced with a new pan and surround, black fixtures and a glass enclosure. The updated floor, walls and ceiling brought the shower area together with the rest of the ensuite.

The work behind the finished room.

Open the shower area

After the old shower and finishes were removed, the work included framing at the exterior wall and corrections to attic-side insulation and vapour barrier before the room was closed up.

Rebuild the shower and improve ventilation

The renovation included a new shower pan and surround, new drain and water lines, and an exhaust fan. The glass enclosure and fittings were installed as the room was finished.

Refinish the ceiling and the room

The textured ceiling was skimmed to a flatter finish, and the walls and ceiling were painted. A new vanity, flooring, trim, mirrors and accessories completed the documented work.

THE PROJECT IN PHOTOS

From the original ensuite to the finished room.

Original ensuite vanity, shower enclosure and tiled floor before renovation.
Before · The original vanity and tiled floor
Ensuite shower area after demolition, with wall and ceiling insulation exposed.
During demolition · The shower area opened up
Ensuite vanity area with patched walls and protected floor during renovation.
During renovation · The vanity area prepared for finishes
Finished ensuite vanity with a round mirror, black faucet and updated flooring.
After · The new vanity, mirror and flooring

THE RESULT

A renewed ensuite, with the hidden work addressed too.

The finished ensuite has a new shower enclosure, vanity and flooring, along with a flatter painted ceiling. Behind those visible changes were ventilation, plumbing, framing and insulation work completed as part of the renovation.

Project scope: demolition, shower pan and surround, drain and water lines, exhaust fan, framing and insulation work, drywall and ceiling refinishing, painting, vanity, flooring, glass, trim and fixtures.

Planning an ensuite renovation? Explore our Regina bathroom renovation service, read the bathroom renovation cost guide, or use the bathroom budget calculator.

Historical project range: Oakridge’s invoiced work fell in the $20,000–$30,000 range, including tax and the selected shower and fixture supply package. Other homeowner costs may not be included. This is historical context for this project, not a current quote.

LET’S PLAN YOUR RENOVATION

Planning an ensuite renovation?

Tell us about your bathroom, what you’d like to change and which details matter most to you. We’ll discuss a practical next step.
Scroll to Top