REGINA · BATHROOM RENOVATION CASE STUDY

A new shower, without the old bulkhead.

This Regina bathroom renovation replaced an older shower and its low bulkhead with a new shower surround, glass doors and a refinished ceiling. Behind the finished room were changes to the drain, framing and insulation.
Black rainfall and handheld shower fixtures against a light-coloured shower surround.
The new shower · Black fixtures and a light-coloured surround

PROJECT AT A GLANCE

Regina, Saskatchewan

Residential bathroom

Shower and bathroom renovation

Bulkhead removal, shower rebuilding and finishes
Original bathroom with vanity, shower enclosure and low bulkhead before renovation.
Before · The original bathroom and low shower bulkhead

THE STARTING POINT

A shower tucked beneath a low bulkhead.

The original bathroom had a shower enclosure beneath a lowered bulkhead, a textured ceiling, shelving and older flooring. The renovation involved removing the existing shower and surrounding finishes, then rebuilding the shower area and finishing the room.

BEFORE & AFTER

A different shower in the same space.

Original bathroom with vanity, shower enclosure and low bulkhead before renovation.
Before · The original bathroom and shower enclosure
New shower surround, white pan and black-framed glass doors as installation wraps up.
After · The new shower and glass doors as installation wrapped up
The bulkhead was removed and the shower area rebuilt with a new pan, surround and glass doors. The finished view shows the shower near the end of installation.

What happened behind the finished shower.

Remove the old enclosure and bulkhead

The existing shower, bulkhead, shelving, vanity and flooring were removed as part of the demolition. Opening the ceiling also allowed the attic-side vapour barrier and insulation to be repaired before the room was closed up.

Prepare the framing and drain for the new pan

A wall was framed to suit the new shower pan, the drain was relocated, and the pan was set in a mortar bed. The valve and water lines were connected before the homeowner-selected shower surround was installed.

Finish the ceiling, walls and shower

Drywall, painting, flooring, baseboard, trim and glass doors completed the documented work. The ceiling was refinished as part of the renovation, giving the new shower a cleaner transition into the rest of the room.

THE PROJECT IN PHOTOS

The details behind the transformation.

Original textured bathroom ceiling and lowered bulkhead above the shower.
Before · The textured ceiling and lowered bulkhead
New shower pan and wall surround being installed while the ceiling and insulation remain open.
During · The new pan and surround, with the ceiling still open

THE RESULT

A rebuilt shower and a refreshed bathroom.

The result is a new shower with a light-coloured surround, black fixtures and glass doors. Removing the bulkhead and refinishing the surrounding surfaces changed the shower area, while the drain, framing and insulation work supported the visible finish.

Project scope: demolition, shower framing and drain relocation, a new pan and surround, attic-side insulation and vapour-barrier repairs, drywall, ceiling refinishing, flooring, paint, trim and glass doors.

Planning a similar project? Explore our Regina bathroom renovation service, read the bathroom renovation cost guide, or use the bathroom budget calculator.

Historical project range: Oakridge’s invoiced work fell in the $15,000–$25,000 range, including tax and the selected shower supply package. Other homeowner costs may not be included. This is historical context for this project, not a current quote.

LET’S PLAN YOUR RENOVATION

Planning a bathroom or shower renovation?

Tell us about your existing bathroom, what you want to change and what matters most in the finished space. We’ll discuss a practical next step.
Scroll to Top