REGINA · BASEMENT RENOVATION CASE STUDY

New basement flooring, with a finished room for storage.

What began as a basement flooring project grew to include a new enclosed storage room. Oakridge coordinated the flooring work and built, wired and finished the room beside the stairs.
Finished basement flooring and new white storage room wall and door beside the stairs.
After · New flooring and the finished storage-room wall

PROJECT AT A GLANCE

Regina, Saskatchewan

Residential basement

Flooring and storage room

Floor preparation, new walls, electrical and finishing
Original basement with carpeted stairs, carpet flooring and built-in shelving before renovation.
Before · Carpeted basement and stairs

THE STARTING POINT

A flooring update became a chance to add storage.

The original basement had carpet across the floor and stairs. The flooring plan called for different finishes in different areas. As the project developed, the homeowners added a storage room to the scope, with two new walls and a door beside the stairs.

BEFORE & AFTER

From an open area to a finished storage room.

Original basement with carpeted stairs, carpet flooring and built-in shelving before renovation.
Before · Existing carpet and the open area beside the stairs
Finished basement flooring and new white storage room wall and door beside the stairs.
After · New flooring, walls and a door to the storage room
The stairs and built-in shelving help show how the space changed. The new walls define the storage room, while the updated flooring continues through the basement.

The work behind the finished space.

Prepare the basement for new flooring

The existing carpet was removed from the floor and stairs. Tack strips were retained where new carpet was planned and removed where a resilient floor was planned. An existing access hatch in the mechanical area was also adjusted as part of the work.

Build and finish the storage room

Two walls were framed to suit the homeowners’ plan. They were drywalled, finished, primed and painted; a selected door, casing and baseboard completed the room after the flooring went in.

Add lighting where it was needed

The electrical work included moving a light, adding two motion-activated lights inside the storage room and replacing a receptacle. Those details made the new room functional as well as enclosed.

THE PROJECT IN PHOTOS

From floor preparation to the finished room.

Bare basement floor beside the stairs after the old carpet was removed.
Preparation · The floor after carpet removal
Newly boarded basement walls and doorway during storage room construction.
Construction · New walls and doorway being finished
Finished basement storage room with painted walls, new flooring and access hatch.
After · Inside the finished storage room
Finished basement wall, flooring and stair area beside the storage room.
After · The new wall and flooring beside the stairs

THE RESULT

A refreshed basement with storage built into the plan.

The basement now has updated flooring and a separate, finished storage room. Building the new walls before the flooring was completed allowed the door, trim and finishes to come together as part of the same project.

Project scope: carpet removal and floor preparation, flooring coordination, two framed storage-room walls, drywall and paint, electrical changes, door and trim, and an adjustment to an existing access hatch.

Planning a basement project? Explore our Regina basement renovation service or use the basement budget calculator to start planning your scope.

Historical project range: Oakridge’s invoiced work for the documented flooring and storage-room scope fell in the $8,000–$15,000 range, including tax. Other homeowner purchases or work may not be included. This is historical context for this project, not a current quote.

LET’S PLAN YOUR RENOVATION

Planning a more useful basement?

Tell us how you use the space, what you want to change and whether storage is part of the plan. We’ll discuss a practical next step.
Scroll to Top